Chrysler Brampton Assembly Plant
Acreage: 269 acres
Products: Chrysler 300, Dodge Charger, Dodge Challenger, Lancia Thema
Employment: 3, 393 (3, 206 hourly, 187 salaried) on two shifts
Conveyors: 20.4 miles
Robotics: 581
Union Local: Unifor Local 1285
Plant History: Facility was built in 1986 and acquired by Chrysler Corporation with purchase of American Motors Corporation (AMC) in August 1987. The facility began production of LH vehicles (Chrysler Concorde, Dodge Intrepid and Eagle Vision) in June 1992. Production of the next generation Chrysler Concorde and Dodge Intrepid began in September 1997, followed by the Chrysler LHS and 300M in April 1998. Production of rear-wheel-drive vehicles started at the beginning of 2004 with the launch of the Chrysler 300 and Dodge Magnum. Production of the Dodge Charger was launched in early 2005. Dodge Magnum production was discontinued in late 2007. The all-new 2009 Dodge Challenger SRT8 launched production in May 2008, with the Dodge Challenger following in August 2008. An all-new 2011 Dodge Charger and Dodge Challenger SRT with a new 392 cubic-inch engine began production in December 2010. The all-new 2011 Chrysler 300 rolled off the line in January 2011.
Brampton Satellite Stamping Plant
Floor Space: 230, 000 square feet
Products: 96 inner and outer body stampings: doors, hoods, decklids, fenders and roofs
Equipment: 5 automatic transfer presses, 1 blanking line, 90 die sets (4-minute die changes)
Employment: Included in assembly plant total listed above
Material Handling: Automatic guided vehicles (AGVs) deliver blanks to press lines
You might also like


|
Vintage Photo of Chrysler Assembly Plant (AAO-371) Entertainment Memorabilia ()
|
|
PAKISTAN: Construction plans for proposed $5,850,000,000 vehicle assembly plant, DAIMLER-CHRYSLER AG [Germany] & COASTAL GROUP [UAE].: An article from: WWP-Business Opportunities in Asia & the Pacific Book (Thomson Gale) |
|
PAKISTAN: Construction plans for proposed $5,850,000,000 vehicle assembly plant, DAIMLER-CHRYSLER AG [Germany] & COASTAL GROUP [UAE] Order #: 076906.: ... & Plant Operations in the Developing World Book (Thomson Gale) |
|
|
MEXICO: Construction plans for proposed $1,000,000,000 vehicle assembly plant upgrade project, CHRYSLER GROUP [USA] Order #: 042806.: An article from: ... & Plant Operations in the Developing World Book (Thomson Gale) |
|
|
CHINA: Joint venture construction plans for proposed $205,000,000 vehicle assembly plant move ahead, DAIMLER CHRYSLER AG [Germany], CHINA MOTOR CORP. ... & Plant Operations in the Developing World Book (Worldwide Projects, Inc.) |





Brampton Assembly is a Chrysler automobile factory is located in Brampton, Ontario, Canada. Originally built by American Motors Corporation (AMC) for US$260 million, the manufacturing plant was specially designed for building the Eagle Premier.